Premium

Over 10GWh of grid-scale BESS deployed globally in February, Europe’s contribution increases

LinkedIn
Twitter
Reddit
Facebook
Email

February 2025 saw around 4.5GW/10.5GWh of grid-scale BESS deployments globally, with China continuing to account for the majority but Europe increasing its share from January.

The figure comes from market intelligence firm Rho Motion’s Battery Energy Stationary Storage Monthly Database, and is almost double (+97%) the number from February 2024.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Global grid-scale BESS deployments in February 2025

The 4,487MW/10,473MWh of grid-scale battery energy storage system (BESS) capacity deployed in February was down by about one-fifth from the previous month, when 5,090MW/13,219MWh came online (Rho Motion’s data for January has been tweaked by about 2.5% since).

China led deployments with just over two-thirds of the total installed there: 3,306MW/7,883MWh came online. It accounted for a little over two-thirds in January too. The remaining 1,181MW/2,590MWh came mainly from Europe, North America, South and Central America and Australia.

“The largest project to come online this month was the 200MW/800MWh Henshui Wuyixian Wuyizhen Project in China – a further three projects over 500MWh entered operation this month, one in Chile (the Oasis de Atacama Phase 1 BESS Project) and the remaining two in China,” Rho Motion said.

Europe saw 587MW/1,225MWh of grid-scale BESS projects come online in February, more than double the previous month, contributing 12% to the global figure, versus just a few percent in January.

The largest project in Europe to come online was the first, 200MW/400MWh phase of the Blackhillock BESS in Scotland, which brought the UK’s capacity to 6,280MW/8,889MWh, according to Solar Media’s in-house figures. Those in-house figures indicate the UK accounted for around three-quarters of the total in Europe that came online in February.

North America meanwhile deployed 194MW/344MWh of grid-scale BESS with South and Central America deploying 124MW/620MWh, the latter most likely driven by the Oasis de Atacama project in Chile.

In Australia, Edify Energy’s 185MW/370MWh Koorangie BESS coming online accounted for the whole of the Oceania region’s deployments in February, according to Rho Motion’s data (the project is pictured above).

February’s deployments bring global installed BESS base to 154.6GW/358GWh

The installations seen last month mean there is now 154.6GW/358.7GWh of grid-scale BESS online globally, around two-thirds in China and around one-fifth in North America.

The two regions have 102.2GW/229.4GWh and 28.8GW/84.8GWh of grid-scale BESS online respectively, Rho Motion said. The next largest region is Europe, with 10.7GW/17.5GWh online.

2 December 2025
NH Collection Vittorio Veneto, Rome, Italy
Across two packed days, the Summit focused on three core themes: revenue & trading, the lifecycle of the battery, and optimisation tools. Attendees explored innovative strategies for enhancing asset performance and longevity, with a spotlight on key markets like Germany, Italy, and the UK. Stay tuned for details on the 2025 edition of the Battery Asset Management Summit Europe, where we’ll continue to chart the path forward for energy storage asset management.
24 February 2026
InterContinental London - The O2, London, UK
This isn’t just another summit – it’s our biggest and most exhilarating Summit yet! Picture this: immersive workshop spaces where ideas come to life, dedicated industry working groups igniting innovation, live podcasts sparking lively discussions, hard-hitting keynotes that will leave you inspired, and an abundance of networking opportunities that will take your connections to new heights!

Read Next

June 6, 2025
A news roundup focusing on FlexGen’s recent partnership with Rosendin, Energy Vault and Jupiter Power’s continued development and assistance from Stem Inc. for rPlus Energies.
June 6, 2025
Wisconsin’s first large-scale battery energy storage system (BESS) project, the 110MW Paris Solar-Battery Park, has come online.
June 6, 2025
Owner-operator Eco Stor has connected what it claimed is the largest BESS in Germany to the grid, while its former majority owner is going to build a BESS in Finland.
June 6, 2025
Envision Energy has inked a strategic partnership with SUN Terra to collaborate on energy storage in Southeast Asia, India and Australia.
June 5, 2025
According to the American Clean Power Association’s (ACP’s) Q1 2025 market report, US clean power deployment totalled 7.4GW.

Most Popular

Email Newsletter

OSZAR »