Fluence 16.4MWh BESS inaugurated in Madeira, Portugal

LinkedIn
Twitter
Reddit
Facebook
Email

A 15MW/16.4MWh battery energy storage system (BESS) provided by Fluence has been inaugurated on the Portuguese island of Madeira.

Project manager Diogo Vasconcelos for Empresa de Electricidade da Madeira (EEM), the island’s main utility, announced the inauguration of BESS Vitória via Linkedin on 14 November.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The system sits on the main island of Madeira, a four-island archipelago which is an autonomous community of Portugal. The install is part of a project including another, 3.3MWh system on the smaller island of Porto Santo.

The project has been developed by EEM, which handed the contract to global battery storage system integrator Fluence and parent company Siemens (through its Smart Infrastructure arm).

As Energy-Storage.news wrote at the time the project was announced, the BESS will allow EEM to increase the island’s renewable energy mix to 50%, black start parts of the network and restore grid operations after outages.

The system is made up of Fluence’s lithium iron phosphate-based (LFP) modular energy storage product.

“With this asset, it will be possible to increase the RES (renewable energy sources) hybridisation of our regional electrical system leading to a better grid stabilisation and security of supply by improving key parameters of the electrical grid (frequency & voltage), thus keeping our electrical grid stronger and more resilient to support the regional energy transition that we all aim for,” EEM project manager Vasconcelos said on LinkedIn.

The project has been partly financed by the EU-funded €25 billion (US$25.8 billion) POSEUR programme – ‘Operational Programme for Sustainability and Efficient Use of Resources’. The programme was established in 2014 to support Portugal’s energy transition sustainable economic development.

The Iberian country has not announced a significant number of energy storage projects this year but those that have are sizeable. In July, a 40GWh pumped hydro storage facility from utility Iberdrola came online while in March, Enel Group was awarded the grid connection rights to develop a renewable enegy park with a 168.6MW BESS to replace the country’s last coal power plant.

Energy-Storage.news’ publisher Solar Media will host the eighth annual Energy Storage Summit EU in London, 22-23 February 2023. This year it is moving to a larger venue, bringing together Europe’s leading investors, policymakers, developers, utilities, energy buyers and service providers all in one place. Visit the official site for more info.

24 February 2026
InterContinental London - The O2, London, UK
This isn’t just another summit – it’s our biggest and most exhilarating Summit yet! Picture this: immersive workshop spaces where ideas come to life, dedicated industry working groups igniting innovation, live podcasts sparking lively discussions, hard-hitting keynotes that will leave you inspired, and an abundance of networking opportunities that will take your connections to new heights!

Read Next

June 19, 2025
IPP R.Power Renewables will launch construction on large-scale BESS projects in Romania and Poland in the second half of this year, while Electrica is procuring EPC works for its own BESS project.
June 17, 2025
Power generation firm RWE has put a BESS in the Netherlands into commercial operation, its first that is capable of providing inertia to the grid.
Premium
June 16, 2025
The question of where the cells in a BESS are from ties in to safety, performance, design and, increasingly, potential tariffs.
June 16, 2025
A trio of major players in the battery storage system integration space have unveiled recent Large-Scale Fire Testing (LSFT) results.
Premium
June 12, 2025
In this blog, ESN Premium speaks with Fluence’s Rob Hills and Sam Markham about hybrid assets and trends in Australia’s NEM.

Most Popular

Email Newsletter

OSZAR »