DTEK enlists Fluence for 200MW/400MWh of grid-supporting BESS in Ukraine

LinkedIn
Twitter
Reddit
Facebook
Email

System integrator Fluence will provide 200MW/400MWh of BESS for independent power producer (IPP) DTEK’s projects in Ukraine.

The battery energy storage system (BESS) equipment will go towards projects that DTEK won ancillary service contracts for with the transmission system operator (TSO) of Ukraine, Ukrenergo, in September 2024.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The projects were awarded amidst a period of heavy aerial attacks on the country’s critical grid infrastructure by Russia, and DTEK said at the time that BESS was pivotal to the ‘decentralisation of Ukraine’s energy system and ending Russia’s energy terror’.

The 200MW/400MWh of capacity will be spread across six projects, ranging from 20-50MW, which the companies need to complete by October 2025 in order to help mitigate against power grid outages during the 2025/26 winter season. They are being developed by DTEK subsidiary DTEK Renewables.

The BESS will provide frequency and power balancing services and will be equipped with grid-forming capabilities, which would enable services like inertia and black start (although these were not specified in the announcement). They are part of DTEK’s #FightforLight campaign, which aims to keep power online during extreme conditions of war.

DTEK’s energy storage lead Vadym Utkin discussed the projects at Solar Media’s Energy Storage Summit Central Eastern Europe (CEE) 2024 in Warsaw, shortly after the contract awards with Ukrenergo.

Energy storage is seen more widely as a way to help Europe solve the energy crisis which started with Russia’s invasion of Ukraine in 2022, as stated later that year by the European Commission’s VP Maroš Šefčovič.

Fluence has track record in the CEE region, and nearby, particularly on TSO-led projects, having deployed 200MW of storage-as-transmission projects in Lithuania and numerous TSO and non-TSO projects in Germany.

Distributed BESS projects in Ukraine to help mitigate against power outages are also being developed via a partnership between the State Agency on Energy Efficiency and Energy Saving of Ukraine (SAEE) and Norwegian LFP gigafactory firm Morrow Batteries, announced in August last year.

DTEK is also active in BESS in neighbouring Poland, acquiring a 133MW project from developer Columbus Energy last year.

3 June 2025
Stuttgart, Germany
Held alongside the Battery Show Expo Europe in Stuttgart, Energy Storage Germany spotlights Germany’s rapid ascent in the European storage sector. Once driven by residential demand, utility-scale projects are now surging, with 184 MW added across 44 projects in 2023. With nearly 16 GWh of capacity installed in the first half of 2024, Germany is set to integrate 24 GW of utility-scale energy storage by 2037, creating substantial opportunities.
23 September 2025
Warsaw, Poland
The Energy Storage Summit Central Eastern Europe is set to return in September 2025 for its third edition, focusing on regional markets and the unique opportunities they present. This event will bring together key stakeholders from across the region to explore the latest trends in energy storage, with a focus on the increasing integration of energy storage into regional grids, evolving government policies, and the growing need for energy security.
2 December 2025
NH Collection Vittorio Veneto, Rome, Italy
Across two packed days, the Summit focused on three core themes: revenue & trading, the lifecycle of the battery, and optimisation tools. Attendees explored innovative strategies for enhancing asset performance and longevity, with a spotlight on key markets like Germany, Italy, and the UK. Stay tuned for details on the 2025 edition of the Battery Asset Management Summit Europe, where we’ll continue to chart the path forward for energy storage asset management.
24 February 2026
InterContinental London - The O2, London, UK
This isn’t just another summit – it’s our biggest and most exhilarating Summit yet! Picture this: immersive workshop spaces where ideas come to life, dedicated industry working groups igniting innovation, live podcasts sparking lively discussions, hard-hitting keynotes that will leave you inspired, and an abundance of networking opportunities that will take your connections to new heights!

Read Next

May 16, 2025
Developer Elgin Energy has secured grid connection approval from AEMO for a 150MW solar-plus-storage site in Victoria.
May 15, 2025
Utility and power generation firm Engie has started construction on a 100MW/400MWh BESS project in Belgium, for which it has enlisted system integrator NHOA Energy to provide the BESS.
Premium
May 14, 2025
Three executives from the world’s largest battery company CATL gave a Q&A at ees Europe last week, with Energy-Storage.news in attendance.
May 14, 2025
The Mobility House will provide its aggregation and trading software to Electrohold, the energy trading arm of IPP and T&D network owner Eurohold Bulgaria, to optimise a 2.5GWh portfolio of BESS projects.
May 13, 2025
Intensifying competition and unpredictable market conditions in the BESS sector increase the need for robust forecasting and optimisation strategies.

Most Popular

Email Newsletter

OSZAR »