AES to build 100MW battery in Arizona for ‘solar after sunset’

LinkedIn
Twitter
Reddit
Facebook
Email
Source: AES.

AES will develop a 100MW battery for the utility Arizona Public Service.

The installation will be used to provide “critical peaking capacity” and “increased” grid reliability. AES will provide a system with a four-hour duration based on Fluence’s Advancion platform. It will be leased under a 20-year contract with AES the owner and operator of the project.

This article requires Premium SubscriptionBasic (FREE) Subscription

Enjoy 12 months of exclusive analysis

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Annual digital subscription to the PV Tech Power journal
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

“Arizona is realizing its great solar potential. As the state continues its transition to more sustainable energy sources, customers will require cost-effective and reliable electricity,” said Andrés Gluski, president and CEO, AES. “Energy storage can replace traditional peaking thermal generation to meet peak power demands while reducing greenhouse gas emissions and maximizing the use of renewable energy,” he added.

AES developed a smaller 4MW battery peaker in 2017.

“By delivering solar after sunset, these projects with AES signal a new direction for how we can meet our customers’ peak need for energy with an increasingly clean mix of resources,” said Brad Albert, VP, resource management, APS. “This work with AES is also part of a long-term transition to larger roles for renewable and storage technologies in Arizona’s energy future,” he added.

Read Next

June 9, 2025
Ascend Analytics recently released its ERCOT Market Report, Release 5.2, containing power market forecasts from the company.
June 6, 2025
A news roundup focusing on FlexGen’s recent partnership with Rosendin, Energy Vault and Jupiter Power’s continued development and assistance from Stem Inc. for rPlus Energies.
June 6, 2025
Wisconsin’s first large-scale battery energy storage system (BESS) project, the 110MW Paris Solar-Battery Park, has come online.
June 5, 2025
According to the American Clean Power Association’s (ACP’s) Q1 2025 market report, US clean power deployment totalled 7.4GW.
June 4, 2025
New analysis from Clean Energy Associates (CEA) and Wood Mackenzie highlights the challenges facing the US battery storage market due to trade tariffs.

Most Popular

Email Newsletter

OSZAR »